5p Challenger semi-integrated uit 2021

Sleeps 5
Comfortable sleeping area for 5 persons
5 secure places
Seats with seat belts
Driving licence B
Your car license is sufficient to drive this vehicle weighing less than 3500 kg
Going Abroad Allowed
The owner allows his vehicle to leave the country
4.8/5 based on 4 reviews
Hired out 12 times
Replies within a few hours

This text has been automatically translated by Google. Switch to original

Our motorhome is ready to give you an unforgettable, carefree holiday.
All the amenities to enjoy comfort and a luxurious home feeling during both summer and winter.

Ideal for couples with children, ISOFIX AVAILABLE!!
At the rear are 2 bunk beds, 1 of which is an electric lifting bed.
Under the lower bunk there is a nice storage space ideal for socks, underwear, towels, games,... and in addition, a large wardrobe, next to the shower, with plenty of hangers and...

Features

Bed layout

Bed layout 1
200 x 160 cm
Bed layout 2
200 x 85 cm
Bed layout 3
200 x 85 cm
Bed layout 4
199 x 140 cm

Amenities

Living area
  • Air conditioning living
  • Awning
  • Bike carrier
  • Camping table and chairs
  • Dinette
  • Freezer
  • Garage
  • Gas cylinder
  • Heating
  • Hot water
  • Kitchen equipment
  • Linens
  • L-seat
  • Off-grid camping
  • Outside shower
  • Oven
  • Refrigerator
  • Safety box
  • Shower
  • Solar panel
  • Stove
  • Swivel seats
  • Toilet
  • Towels included
  • TV
  • TV receiver
  • Winter camping
Cab features
  • Airbags
  • Air conditioning cabin
  • Audio input
  • Bluetooth
  • Cruise Control
  • GPS
  • Isofix
  • Parking assistance
  • Power Steering
  • Radio
  • Reversing camera
  • Roof rack
  • Snow chains
  • Towbar
  • Winter tyres

Technical Characteristics

Challenger
Coachbuilt
Automatic
Driving licence B
Euro 6
Isofix: 2
First registration in 2021
Motorhome length and height: 756 cm x 295 cm

Rental Conditions

House Rules

Smoking Allowed: No
Pets Allowed: No
Going Abroad Allowed: Yes
Wintersport Allowed: Please enquire
Festivals Allowed: Please enquire
Mountains allowed: Yes
Minimum Age Restriction: 26 years

Drivers must have held a license for at least 3 years and had 3 years without a claim with aggravating circumstances.

This text has been automatically translated by Google. Switch to original

The camper is filled on departure with a full tank and ad blue - to be returned with a full tank and ad blue
Toilet and waste water tank emptied/flushed - to be returned with an emptied toilet and waste water tank.

Upon departure we will deliver it to you very neatly, both inside and out, and we will briefly go over how everything works.
We expect you to return this brush clean and tidy, or as agreed.

We rent this to you completely damage-free (within the possibilities), but if there is any damage or the like, we expect this to be reported.
We are very understanding of possible accidents, so if there is any damage, this must be reported within 24 hours.

We have sheets and bed linen available, if you would like to use this, this can be done at an additional cost including laundry costs: €20 for the large bed, €15 per bunk bed (small beds).

Cleaning inside and outside is also possible for an additional charge of €160 (€70 outside, €100 inside) if you prefer not to do this yourself.
toilet cleaned and waste water tank emptied (if not ok extra charge €75)

Pricing

Weekly mileage limit 2,000 km
Price per extra KM €0.20
Cleaning Fee €0
Last-Minute Discount
Bookings within 1 week3%
Bookings within 2 weeks5%
Long Trip Discount
Bookings 1 week or longer3%
Bookings 2 weeks or longer5%
Bookings 3 weeks or longer7%
Bookings 4 weeks or longer8%

Availability

  • Pickup Time: 1:00 PM
  • Return Time: 12:00 PM
  • 3 nights minimum
This motorhome's calendar was updated recently

4 Reviews

Antoine Antoine

View this text in English

Zeer fijne camper. Meer geschikt voor 4 personen ivm krappe zit plaatsen met gordels. Maar voor kortere trips geen probleem. Fijn contact met verhuurder. August 2025
Dylan Dylan

View this text in English

-Zeer vriendelijk in omgaan -Mobilhome voldoet aan de verwachtingen en is zeer praktisch ingericht -Ideaal om een gezellige vakantie te beleven August 2025
Lieve Lieve

View this text in English

Praktische regelingen met Staf verliepen heel vlot. Zowel bij het ophalen als het terugbrengen. We hadden een geslaagd weekend in de Ardennen en in Limburg. Ruime camper met alle voorzieningen. May 2025
Wine Wine

View this text in English

Aangename en ruime camper voor ons gezin van 4 waaronder 2 tieners. De kinderen hadden elk hun eigen plekje op het stapelbed en het dubbel bed voor ons was erg ruim. We hebben 4 dagen rondgezworven door Nederland in alle comfort: koken, douchen, toilet... . De camper stond volledig klaar en Staf gaf duidelijke uitleg, we konden er direct op uit zonder voor een verassing te staan! Dank je wel, Staf! April 2025